Referring to test plans, how many roof drains are needed in build-up areas?

  1. 6

  2. 10

  3. 12

  4. 15

The correct answer is: 12

In determining the appropriate number of roof drains needed in build-up areas, it is essential to consider factors such as the size of the roof area, local building codes, and the specific drainage requirements outlined in the project specifications. Typically, a standard guideline suggests that one drain is sufficient for every 750 square feet of roof area, but this can vary based on the design and the slope of the roof. Choosing twelve drains indicates an intention to ensure adequate drainage capacity, thereby preventing water accumulation and potential leaks or structural issues. This number typically aligns with industry standards for larger roof areas, allowing for effective water management and minimizing the risk of overflow during heavy rains. Additionally, having a higher number of drains can account for any unexpected increases in water volume caused by heavy precipitation or other factors. The other figures may not provide sufficient coverage, which could lead to inadequate drainage. Therefore, the selection of twelve drains reflects a well-thought-out approach to managing water on the roof and ensuring the longevity and integrity of the building.